September 19, 2024
Delivering Projects

Scheduling and cost control are essential components of project management to ensure that projects are completed on time and within the set budget. If you underestimate, they end up being costly, time-consuming, and of substandard quality; if you overestimate, you stand to lose out on competitiveness. As a project manager, one of the most important phases involving making estimates is one of the most crucial determinants of profitability as well as reputation. In this blog, we are going to talk about how the right estimation aids in improving the resource management and delivery of projects as per the set time and budget.

Estimation – A Key Element in Project Management

Estimation helps to set proper expectations of the amount of effort, resources, and time needed before the actual work starts. Some key reasons why estimation is integral to project management include: 

  • Support planning and scheduling of activities
  • On the one hand, it is a crucial element that allows the efficient use of resources.
  • In this case, it is important to predict possible risks in advance.
  • Obtain clearances for necessary funding requests.
  • Define parameters to use in measuring the performance at the beginning of the implementation.
  • In case of deviations, take corrective actions.

In conclusion, estimates are crucial in goal setting and ensuring that projects are on track with the expected quality, scope, and project objectives with special reference to cost and time. Estimation

Estimation Methods

Different approaches can be used to forecast cost, time, resources, and efforts needed based on historical and current data and/or opinions of experts. Common techniques include:

  1. Low Voltage Electrical Estimating: It is used for low voltage electrical projects involving residential, commercial, and industrial buildings for fire alarms, data networks, home automation, etc. Low voltage costing depends on historical rates, material takeoffs, etc.
  2. Stone Wall Estimating: It is given for the first rough estimation of the required order of magnitude with no details using experts’ intuition and only the top parameters. Enables decision-making in situations where detailed estimation is not feasible due to the limited information available.
  3. HVAC Estimation Services: Proper calculation models, rates, assemblies, and allowances for accurate HVAC Estimating Services, ductwork, piping, and plumbing work including material and equipment costs and human resource costs. May be able to bid out entire mechanical systems including heat, ventilation, and air conditioning work.
  4. Parametric and Model-Based Estimates: Theoretical and empirical formulas to estimate from project characteristics and historical quantitative measures. Ideal when a lot of information can be gathered and drawn from prior similar projects.
  5. Bottom-up Estimating: Breaking down activity and work package levels in terms of cost, material type/quantity, man-hours for each task, etc., is accurate but time-consuming. It is useful for new kinds of projects that have not previously been attempted. Estimation

The traditional methods of estimation rely on experience and are accurate when it comes to determining the expected effort and cost when used appropriately.

Estimation Best Practices

Some good practices that help improve the accuracy of Stone Wall Estimate include: 

  • Involve experts: To obtain more reliable estimates of complex tasks, consult specialists in the field.
  • Regularly updated based on new information: Make sure there is an efficient change control process for modifying the estimates because of changes in requirements.
  • Use range-based estimates: Use minimum, most likely, and maximum point estimates where appropriate rather than only a single point estimate.
  • Estimate at package levels: Subdivide deliverables into work packages for detailed estimating.
  • Keep the estimating process consistent: Adopt standard forms and procedures wherein one project can be directly comparable to another.
  • Document all assumptions: Note all the parameters that you considered, external influences, allowances, and the rates that you decided on.
  • Analyze discrepancies after completion: Conduct post-mortems as a way of comparing the actual values obtained with the estimates to yield better estimates in the future. Estimation

Thus, by gradually formalizing the observed best practices into organizational procedures, the overall effectiveness of the estimating function may be gradually improved, and reliable results can be obtained more frequently.

Conclusion

Budget is one of the most vital factors in construction projects; hence, accurate estimation has a direct bearing on achieving the twin objectives of doing business within the confines of the available funds as well as within the set timelines. As opposed to estimation, various methods provide clearer and more precise results with the help of forecasting and expert opinion, as well as the use of established techniques with best practices. The idea of estimation accuracy is based on an institutionalized procedure that employs appropriate information that can be improved through a feedback loop so that the organization progresses as time passes. 

Being one of the basic prerequisites that result in successful project delivery within the constraints of approved cost and timeline, reliable estimating is fundamental to realistic planning, resource allocation, and scheduling activities. Given its importance, project managers must pay specific attention to refining the estimation process with every project as well as applying empirical evidence, analytical techniques, and findings from other appraisals to enhance the likelihood of achieving timely and efficient delivery of projects. Estimation

Leave a Reply

Your email address will not be published. Required fields are marked *